ITAC Assessment: OK0184
ITAC logo
ITAC Assessment: OK0184
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product KIDNEY DIALYSIS MACHINES
NAICS
n/a
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area
n/a
Annual Production 400
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,147 2,140,973
kWh
Natural Gas $21,445 5,461
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,317 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,317

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $796 $50 $796
11,723
kWh
-
02 2.3191: Use demand controller or load shedder $1,732 $1,800 $1,732
-
kWh
-
03 2.2694: Use highest temperature for chilling or cold storage $2,324 $1,200 $2,324
41,911
kWh
-
04 2.7261: Install timers and/or thermostats $6,465 $2,800 - $6,465
-
MMBtu
TOTAL RECOMMENDED $11,317 $5,850 $4,852
53,634
kWh
$6,465
-
MMBtu
TOTAL IMPLEMENTED $11,317 $5,850 $4,852
53,634
kWh
$6,465
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs