277
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SD0513 #06 Y:2015 | 06 | 2015 | Utilize energy-efficient belts and other improved mechanisms | $356 | $72 | |
| SD0513 #05 Y:2015 | 05 | 2015 | Install occupancy sensors | $505 | $350 | |
| SD0513 #04 Y:2015 | 04 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,240 | $2,500 | |
| SD0513 #03 Y:2015 | 03 | 2015 | Reduce temperature of process equipment when on standby | $1,873 | $200 | |
| SD0513 #02 Y:2015 | 02 | 2015 | Cover open tanks | $4,719 | $415 | |
| SD0513 #01 Y:2015 | 01 | 2015 | Replace existing hvac unit with high efficiency model | $10,628 | $42,560 | |
| UD0931 #12 Y:2015 | 12 | 2015 | Utilize higher efficiency lamps and/or ballasts | $26,628 | $83,660 | |
| UD0931 #11 Y:2015 | 11 | 2015 | Utilize daylight whenever possible in lieu of artificial light | $3,127 | $9,200 | |
| UD0931 #10 Y:2015 | 10 | 2015 | Use adjustable frequency drive or multiple speed motors on existing system | $8,937 | $41,800 | |
| UD0931 #09 Y:2015 | 09 | 2015 | Use adjustable frequency drive or multiple speed motors on existing system | $4,769 | $24,400 | |
| UD0931 #08 Y:2015 | 08 | 2015 | Reduce fluid flow rates | $14,443 | $14,964 | |
| UD0931 #07 Y:2015 | 07 | 2015 | Use adjustable frequency drive or multiple speed motors on existing system | $12,063 | - | |
| UD0931 #06 Y:2015 | 06 | 2015 | Use adjustable frequency drive or multiple speed motors on existing system | $108,502 | $151,300 | |
| UD0931 #05 Y:2015 | 05 | 2015 | Utilize energy-efficient belts and other improved mechanisms | $10,304 | - | |
| UD0931 #04 Y:2015 | 04 | 2015 | Develop a repair/replace policy | $1,102 | $3,250 | |
| UD0931 #03 Y:2015 | 03 | 2015 | Replace city water with recycled water via cooling tower | $171,582 | $16,050 | |
| UD0931 #02 Y:2015 | 02 | 2015 | Use heat in flue gases to preheat products or materials | $185,788 | $193 | |
| UD0931 #01 Y:2015 | 01 | 2015 | Reschedule plant operations or reduce load to avoid peaks | $108,029 | - | |
| WM0007 #06 Y:2012 | 06 | 2012 | Install skylights | $34,161 | $123,125 | |
| WM0007 #05 Y:2012 | 05 | 2012 | Reduce illumination to minimum necessary levels | $1,041 | $200 |