| Assessment Year | 2012 |
|---|---|
| Principal Product | Glass Windows |
| NAICS | 327211: Flat Glass Manufacturing |
| SIC | 3211: Flat Glass |
| Sales Range | $50 M to 100M |
| # of Employees | 350 |
| Plant Area |
422,000
ft2
|
| Annual Production | 2,360,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $746,966 | 14,380,800 |
kWh
|
$0.052 |
| Electricity Demand | $418,290 | 39,290 |
kW-mo/yr
|
$10.65 |
| Natural Gas | $43,380 | 5,390 |
MMBtu
|
$8.05 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $51,567 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,425 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4313: Provide proper maintenance of motor driven equipment | $3,505 | - |
$2,729
52,575
kWh
|
$1,077
-
kW-mo/yr
|
$(-300.0) | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,425 | $125 |
$2,456
47,317
kWh
|
$969
-
kW-mo/yr
|
- | |
| 03 | 2.7221: Lower temperature during the winter season and vice-versa | $1,646 | - |
$1,378
22,377
kWh
|
$267
-
kW-mo/yr
|
- | |
| 04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $7,789 | $250 | - |
$7,789
-
kW-mo/yr
|
- | |
| 05 | 2.7111: Reduce illumination to minimum necessary levels | $1,041 | $200 |
$594
9,646
kWh
|
$447
-
kW-mo/yr
|
- | |
| 06 | 2.7145: Install skylights | $34,161 | $123,125 |
$6,446
104,642
kWh
|
$1,715
-
kW-mo/yr
|
$26,000 | |
| TOTAL RECOMMENDED | $51,567 | $123,700 |
$13,603
236,557
kWh
|
$12,265
-
kW-mo/yr
|
$25,700 | ||
| TOTAL IMPLEMENTED | $3,425 | $125 |
$2,456
47,317
kWh
|
$969
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs