Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,845

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Stone, clay, glass, and concrete products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0084 #09 Y:1995 Insulate bare equipment $331 $453
WV0084 #08 Y:1995 Use waste heat from hot flue gases to preheat $646 $1,450
WV0084 #07 Y:1995 Analyze flue gas for proper air/fuel ratio $638 $1,000
WV0084 #06 Y:1995 Reschedule plant operations or reduce load to avoid peaks $6,138 -
WV0084 #05 Y:1995 Reduce the pressure of compressed air to the minimum required $907 $40
WV0084 #04 Y:1995 Install compressor air intakes in coolest locations $480 $275
WV0084 #03 Y:1995 Utilize energy-efficient belts and other improved mechanisms $746 $2,000
WV0084 #02 Y:1995 Use most efficient type of electric motors $570 $10,840
WV0084 #01 Y:1995 Reduce illumination to minimum necessary levels $1,160 $800
KG0052 #07 Y:1995 Improved material handling (mixing and transfer) $5,655 $2,000
KG0052 #06 Y:1995 Reuse rags until completely soiled $1,169 -
KG0052 #05 Y:1995 Recover and reuse waste material $2,750 $75
KG0052 #04 Y:1995 Utilize higher efficiency lamps and/or ballasts $70 $53
KG0052 #03 Y:1995 Install timers and/or thermostats $756 $150
KG0052 #02 Y:1995 Use synthetic lubricant $841 -
KG0052 #01 Y:1995 Use most efficient type of electric motors $1,932 $4,900
OD0050 #07 Y:1995 Recover and reuse waste material $24,226 $1,072
OD0050 #06 Y:1995 Turn off equipment when not in use $1,504 -
OD0050 #05 Y:1995 Recharge batteries on during off-peak demand periods $765 -
OD0050 #04 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $443 $240