ITAC Assessment: KG0052
ITAC logo
ITAC Assessment: KG0052
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Precast reinforced concrete pipes and boxes
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area 48,615
ft2
Annual Production 52,000
lb
Production Hrs. Annual 2,210
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $431,749 4,317,120
kWh
Electricity Demand $4,925 2,679
kW-mo/yr
Electricity Fees $102 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,173 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $1,932 $4,900 $1,710
30,188
kWh
$222
-
kW-mo/yr
-
02 2.4314: Use synthetic lubricant $841 - $706
12,603
kWh
$135
-
kW-mo/yr
-
03 2.7261: Install timers and/or thermostats $756 $150 $756
13,482
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $70 $53 $59
1,172
kWh
$11
-
kW-mo/yr
-
05 3.5311: Recover and reuse waste material $2,750 $75 - - $2,750
-
lb
06 3.7132: Reuse rags until completely soiled $1,169 - - - $1,169
-
lb
07 3.7212: Improved material handling (mixing and transfer) $5,655 $2,000 - - $5,655
-
lb
TOTAL RECOMMENDED $13,173 $7,178 $3,231
57,445
kWh
$368
-
kW-mo/yr
$9,574
-
lb
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs