| Assessment Year | 1996 |
|---|---|
| Principal Product | Concrete Pipes |
| NAICS |
n/a
|
| SIC | 3272: Concrete Products, Except Block and Brick |
| Sales Range | $5 M to 10M |
| # of Employees | 40 |
| Plant Area |
1,742,400
ft2
|
| Annual Production | 10,000
ton
|
| Production Hrs. Annual | 2,900
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $51,700 | 977,433 |
kWh
|
$0.053 |
| Electricity Demand | $20,618 | 4,867 |
kW-mo/yr
|
$4.24 |
| Fuel Oil #2 | $11,580 | 2,097 |
MMBtu
|
$5.52 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $29,652 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $683 | $389 |
$592
11,137
kWh
|
$91
-
kW-mo/yr
|
- | - | |
| 02 | 2.7134: Use photocell controls | $1,801 | $3,600 |
$1,801
33,998
kWh
|
- | - | - | |
| 03 | 2.7111: Reduce illumination to minimum necessary levels | $840 | - |
$720
13,482
kWh
|
$120
-
kW-mo/yr
|
- | - | |
| 04 | 2.4133: Use most efficient type of electric motors | $956 | $3,206 |
$687
12,896
kWh
|
$269
-
kW-mo/yr
|
- | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,918 | $350 |
$1,918
25,791
kWh
|
- | - | - | |
| 06 | 3.6192: Use a less expensive method of waste removal | $4,056 | - | - | - | - | $4,056 | |
| 07 | 2.2424: Use heat in flue gases to preheat products or materials | $19,398 | $2,500 | - | - |
$1,848
-
MMBtu
|
$17,550 | |
| TOTAL RECOMMENDED | $29,652 | $10,045 |
$5,718
97,304
kWh
|
$480
-
kW-mo/yr
|
$1,848
-
MMBtu
|
$21,606 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs