ITAC Assessment: UF0138
ITAC logo
ITAC Assessment: UF0138
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Concrete Pipes
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 1,742,400
ft2
Annual Production 10,000
ton
Production Hrs. Annual 2,900
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,700 977,433
kWh
Electricity Demand $20,618 4,867
kW-mo/yr
Fuel Oil #2 $11,580 2,097
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,652 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $683 $389 $592
11,137
kWh
$91
-
kW-mo/yr
- -
02 2.7134: Use photocell controls $1,801 $3,600 $1,801
33,998
kWh
- - -
03 2.7111: Reduce illumination to minimum necessary levels $840 - $720
13,482
kWh
$120
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $956 $3,206 $687
12,896
kWh
$269
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,918 $350 $1,918
25,791
kWh
- - -
06 3.6192: Use a less expensive method of waste removal $4,056 - - - - $4,056
07 2.2424: Use heat in flue gases to preheat products or materials $19,398 $2,500 - - $1,848
-
MMBtu
$17,550
TOTAL RECOMMENDED $29,652 $10,045 $5,718
97,304
kWh
$480
-
kW-mo/yr
$1,848
-
MMBtu
$21,606
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs