Assessment Year | 1987 |
---|---|
Principal Product | SPEED REDUCTION EQUIP |
NAICS |
n/a
|
SIC | 3566: Speed Changers, Industrial High-Speed Drives, and Gears |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
n/a
|
Annual Production | 70,000
pieces
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $183,761 | 3,670,868 |
kWh
|
$0.050 |
Natural Gas | $56,074 | 13,101 |
MMBtu
|
$4.28 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,886 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,144 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $1,461 | $500 |
$1,461
29,308
kWh
|
- | |
02 | 2.2437: Recover waste heat from equipment | $2,213 | $3,000 | - |
$2,213
-
MMBtu
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,081 | $250 |
$3,081
61,547
kWh
|
- | |
04 | 2.3132: Recharge batteries on during off-peak demand periods | $1,490 | $2,000 |
$1,490
-
kWh
|
- | |
05 | 2.1221: Replace obsolete burners with more efficient ones | $2,800 | $13,500 | - |
$2,800
-
MMBtu
|
|
06 | 2.7314: Reduce ventilation air | $300 | $36 |
$107
2,052
kWh
|
$193
-
MMBtu
|
|
07 | 2.2511: Insulate bare equipment | $187 | $60 | - |
$187
-
MMBtu
|
|
08 | 2.7492: Use proper thickness of insulation on building envelope | $2,609 | $10,000 | - |
$2,609
-
MMBtu
|
|
09 | 2.7492: Use proper thickness of insulation on building envelope | $149 | $525 | - |
$149
-
MMBtu
|
|
10 | 2.7243: Improve air circulation with destratification fans / other methods | $1,942 | $4,800 |
$(-307.0)
(-6,155)
kWh
|
$2,249
-
MMBtu
|
|
11 | 2.7261: Install timers and/or thermostats | $2,841 | $474 |
$299
5,862
kWh
|
$2,542
-
MMBtu
|
|
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,813 | $2,762 |
$3,813
76,202
kWh
|
- | |
TOTAL RECOMMENDED | $22,886 | $37,907 |
$9,944
168,816
kWh
|
$12,942
-
MMBtu
|
||
TOTAL IMPLEMENTED | $18,144 | $19,607 |
$10,251
174,971
kWh
|
$7,893
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs