ITAC Assessment: CO0180
ITAC logo
ITAC Assessment: CO0180
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product IRRIGATION SYSTEMS
NAICS
n/a
SIC 3523: Farm Machinery and Equipment
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area
n/a
Annual Production 400
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,529 1,007,327
kWh
Natural Gas $31,870 6,672
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,796 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,806

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8114: Change rate schedules or other changes in utility service $8,040 $12,000 $8,040
-
kWh
-
02 2.8113: Purchase gas directly from a contract gas supplier $6,850 $6,700 - $6,850
-
MMBtu
03 2.7261: Install timers and/or thermostats $3,600 $1,500 - $3,600
-
MMBtu
04 2.7211: Clean and maintain refrigerant condensers and towers $1,920 $3,400 - $1,920
-
MMBtu
05 2.7492: Use proper thickness of insulation on building envelope $1,180 $2,700 - $1,180
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $850 $500 $850
12,016
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $240 $400 $240
3,517
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $116 $128 $116
1,758
kWh
-
TOTAL RECOMMENDED $22,796 $27,328 $9,246
17,291
kWh
$13,550
-
MMBtu
TOTAL IMPLEMENTED $4,806 $2,528 $1,206
17,291
kWh
$3,600
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs