ITAC Assessment: MU0094
ITAC logo
ITAC Assessment: MU0094
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Automotive Exhaust Systems
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 48
Plant Area 58,000
ft2
Annual Production 85,000
units
Production Hrs. Annual 3,100
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,531 317,286
kWh
Electricity Fees $3,547 -
Natural Gas $17,570 2,130
MMBtu
Other Gas $330 1
MMBtu
Waste Disposal Costs
Water Usage $279 2,531
Tgal
Water Disposal $392 2,531
Tgal
TOTAL YEARLY COSTS $67,649
RECOMMENDED SAVINGS* $10,975 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,641 $780 $3,641
25,289
kWh
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $2,945 $16,919 - $2,945
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,664 $3,218 $1,664
11,558
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $356 $180 $356
2,539
kWh
-
05 2.7135: Install occupancy sensors $264 $250 $264
1,833
kWh
-
06 2.7221: Lower temperature during the winter season and vice-versa $112 - - $112
-
MMBtu
07 2.7231: Use radiant heater for spot heating $1,943 $8,360 - $1,943
-
MMBtu
08 2.7423: Reduce heat gain by window tinting $50 $20 $50
349
kWh
-
TOTAL RECOMMENDED $10,975 $29,727 $5,975
41,568
kWh
$5,000
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs