ITAC Assessment: TT0108
ITAC logo
ITAC Assessment: TT0108
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Mattresses, box springs, and bedding related accessories
NAICS 337910: Mattress Manufacturing
SIC 2515: Mattresses, Foundations, and Convertible Beds
Sales Range less than $500
k
# of Employees 50
Plant Area 110,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,363 195,920
kWh
Electricity Demand $4,083 988
kW-mo/yr
Natural Gas $2,861 294
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,604 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,126

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,126 $10,709 $1,126
9,381
kWh
-
02 2.3513: Consider power loss as well as initial loads and load growth in down-sizing transformers $5,367 $8,075 $5,367
44,728
kWh
-
03 2.7243: Improve air circulation with destratification fans / other methods $1,110 $1,110 $1,110
9,254
kWh
-
04 2.2135: Repair and eliminate steam leaks $4,000 $980 $3,224
25,444
kWh
$776
-
kW-mo/yr
TOTAL RECOMMENDED $11,604 $20,874 $10,828
88,807
kWh
$776
-
kW-mo/yr
TOTAL IMPLEMENTED $5,126 $11,689 $4,350
34,825
kWh
$776
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs