ITAC Assessment: OR0462
ITAC logo
ITAC Assessment: OR0462
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Sausages and Pepperoni
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area 150,000
ft2
Annual Production 2,895,000
lb
Production Hrs. Annual 4,950
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,087 877,700
kWh
Electricity Demand $11,050 24,468
kW-mo/yr
Electricity Fees $2,830 -
Natural Gas $46,786 7,926
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $523,729 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $522,129

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Primary Product Savings Increase in Production Savings
01 4.112: Replace old machine with new automatic multi-station tool $520,020 $178,400 - - - $40,000 $31,250 $44,770 $404,000
02 3.4156: Use flow control valves on equipment to optimize water use $1,600 $300 - - $1,600
-
gal
- - - -
03 2.4133: Use most efficient type of electric motors $2,109 $1,500 $1,814
36,104
kWh
$295
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $523,729 $180,200 $1,814
36,104
kWh
$295
-
kW-mo/yr
$1,600
-
gal
$40,000 $31,250 $44,770 $404,000
TOTAL IMPLEMENTED $522,129 $179,900 $1,814
36,104
kWh
$295
-
kW-mo/yr
- $40,000 $31,250 $44,770 $404,000