Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Personal leather goods, except women's handbags and purses
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TR0053 #05 Y:2024 Apply for tax-free status for energy purchases $4,027 $2,500
TR0053 #04 Y:2024 Use solar heat to make electricty $11,908 $78,403
TR0053 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $960 $1,000
TR0053 #02 Y:2024 Replace existing hvac unit with high efficiency model $12,921 $47,775
TR0053 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $3,176 $6,207
OK0864 #09 Y:2013 Use flue gas recuperation to reduce voc $79,353 $32,100
OK0864 #08 Y:2013 Reduce combustion air flow to optimum $127,574 $25,000
OK0864 #07 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $46,176 $10,642
OK0864 #06 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $20,158 $10,250
OK0864 #05 Y:2013 Size electric motors for peak operating efficiency $8,999 $27,500
OK0864 #04 Y:2013 Upgrade controls on compressors $5,084 -
OK0864 #03 Y:2013 Insulate bare equipment $2,872 $1,478
OK0864 #02 Y:2013 Use most efficient type of electric motors $655 $1,128
OK0864 #01 Y:2013 Optimize plant power factor $33,277 $58,900
TA0133 #01 Y:2006 Install vinyl strip / high speed / air curtain doors $2,060 $367
UF0187 #09 Y:1997 Eliminate old stock and modify inventory control $1,212,800 $23,600
UF0187 #08 Y:1997 Add equipment/ operators to reduce production bottleneck $35,426 $50,000
UF0187 #07 Y:1997 Minimize water usage $1,800 $3,300
UF0187 #06 Y:1997 Use water-based adhesives $571 -
UF0187 #05 Y:1997 Replace existing hvac unit with high efficiency model $604 $530