matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
TR0053 #05 Y:2024 | 05 | 2024 | Apply for tax-free status for energy purchases | $4,027 | $2,500 |
n/a
|
TR0053 #04 Y:2024 | 04 | 2024 | Use solar heat to make electricty | $11,908 | $78,403 |
n/a
|
TR0053 #03 Y:2024 | 03 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $960 | $1,000 |
n/a
|
TR0053 #02 Y:2024 | 02 | 2024 | Replace existing hvac unit with high efficiency model | $12,921 | $47,775 |
n/a
|
TR0053 #01 Y:2024 | 01 | 2024 | Utilize higher efficiency lamps and/or ballasts | $3,176 | $6,207 |
n/a
|
SD0493 #06 Y:2014 | 06 | 2014 | Turn off equipment when not in use | $939 | $200 | |
SD0493 #05 Y:2014 | 05 | 2014 | Eliminate or reduce compressed air usage | $1,141 | $1,250 | |
SD0493 #04 Y:2014 | 04 | 2014 | Install occupancy sensors | $1,368 | $3,042 | |
SD0493 #03 Y:2014 | 03 | 2014 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,823 | $1,400 | |
SD0493 #02 Y:2014 | 02 | 2014 | Install desiccant humidity control system | $8,026 | $34,300 | |
SD0493 #01 Y:2014 | 01 | 2014 | Reduce illumination to minimum necessary levels | $9,509 | $14,580 | |
OK0864 #09 Y:2013 | 09 | 2013 | Use flue gas recuperation to reduce voc | $79,353 | $32,100 | |
OK0864 #08 Y:2013 | 08 | 2013 | Reduce combustion air flow to optimum | $127,574 | $25,000 | |
OK0864 #07 Y:2013 | 07 | 2013 | Use adjustable frequency drive or multiple speed motors on existing system | $46,176 | $10,642 | |
OK0864 #06 Y:2013 | 06 | 2013 | Use adjustable frequency drive or multiple speed motors on existing system | $20,158 | $10,250 | |
OK0864 #05 Y:2013 | 05 | 2013 | Size electric motors for peak operating efficiency | $8,999 | $27,500 | |
OK0864 #04 Y:2013 | 04 | 2013 | Upgrade controls on compressors | $5,084 | - | |
OK0864 #03 Y:2013 | 03 | 2013 | Insulate bare equipment | $2,872 | $1,478 | |
OK0864 #02 Y:2013 | 02 | 2013 | Use most efficient type of electric motors | $655 | $1,128 | |
OK0864 #01 Y:2013 | 01 | 2013 | Optimize plant power factor | $33,277 | $58,900 |