ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
WM0142 #10 Y:2019 | 10 | 2019 | Use photocell controls | $103 | $201 | |
WM0142 #09 Y:2019 | 09 | 2019 | Install compressor air intakes in coolest locations | $258 | $1,370 | |
WM0142 #08 Y:2019 | 08 | 2019 | Utilize higher efficiency lamps and/or ballasts | $351 | $1,115 | |
WM0142 #07 Y:2019 | 07 | 2019 | Utilize energy-efficient belts and other improved mechanisms | $418 | $750 | |
WM0142 #06 Y:2019 | 06 | 2019 | Utilize higher efficiency lamps and/or ballasts | $619 | $1,160 | |
WM0142 #05 Y:2019 | 05 | 2019 | Recharge batteries on during off-peak demand periods | $1,795 | $2,700 | |
WM0142 #04 Y:2019 | 04 | 2019 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,469 | $3,500 | |
WM0142 #03 Y:2019 | 03 | 2019 | Install vinyl strip / high speed / air curtain doors | $4,679 | $6,540 | |
WM0142 #02 Y:2019 | 02 | 2019 | Use radiant heater for spot heating | $7,329 | $9,450 | |
WM0142 #01 Y:2019 | 01 | 2019 | Install occupancy sensors | $19,750 | $28,500 | |
TT0195 #07 Y:2017 | 07 | 2017 | Apply for investment incentives | $98 | $20 | |
TT0195 #06 Y:2017 | 06 | 2017 | Recover waste heat from equipment | $665 | $750 | |
TT0195 #05 Y:2017 | 05 | 2017 | Use adjustable frequency drive or multiple speed motors on existing system | $1,190 | $3,450 | |
TT0195 #04 Y:2017 | 04 | 2017 | Turn off equipment when not in use | $1,211 | $25 | |
TT0195 #03 Y:2017 | 03 | 2017 | Install outside air damper / economizer on hvac unit | $1,404 | $6,000 | |
TT0195 #02 Y:2017 | 02 | 2017 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,092 | $3,050 | |
TT0195 #01 Y:2017 | 01 | 2017 | Change procedures / equipment / operating conditions | $36,700 | $4,000 | |
GT0630 #09 Y:1997 | 09 | 1997 | Re-arrange equipment layout to reduce labor costs | $17,600 | $26,600 | |
GT0630 #08 Y:1997 | 08 | 1997 | Recover and reuse waste material | $800 | - | |
GT0630 #07 Y:1997 | 07 | 1997 | Turn off equipment when not in use | $2,580 | - |