Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Footwear, except rubber, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0142 #10 Y:2019 Use photocell controls $103 $201
WM0142 #09 Y:2019 Install compressor air intakes in coolest locations $258 $1,370
WM0142 #08 Y:2019 Utilize higher efficiency lamps and/or ballasts $351 $1,115
WM0142 #07 Y:2019 Utilize energy-efficient belts and other improved mechanisms $418 $750
WM0142 #06 Y:2019 Utilize higher efficiency lamps and/or ballasts $619 $1,160
WM0142 #05 Y:2019 Recharge batteries on during off-peak demand periods $1,795 $2,700
WM0142 #04 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $4,469 $3,500
WM0142 #03 Y:2019 Install vinyl strip / high speed / air curtain doors $4,679 $6,540
WM0142 #02 Y:2019 Use radiant heater for spot heating $7,329 $9,450
WM0142 #01 Y:2019 Install occupancy sensors $19,750 $28,500
TT0195 #07 Y:2017 Apply for investment incentives $98 $20
TT0195 #06 Y:2017 Recover waste heat from equipment $665 $750
TT0195 #05 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $1,190 $3,450
TT0195 #04 Y:2017 Turn off equipment when not in use $1,211 $25
TT0195 #03 Y:2017 Install outside air damper / economizer on hvac unit $1,404 $6,000
TT0195 #02 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $3,092 $3,050
TT0195 #01 Y:2017 Change procedures / equipment / operating conditions $36,700 $4,000
GT0630 #09 Y:1997 Re-arrange equipment layout to reduce labor costs $17,600 $26,600
GT0630 #08 Y:1997 Recover and reuse waste material $800 -
GT0630 #07 Y:1997 Turn off equipment when not in use $2,580 -