ITAC Assessment: TT0195
ITAC logo
ITAC Assessment: TT0195
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Military Footwear
NAICS 316210: Footwear Manufacturing
SIC 3149: Footwear, Except Rubber, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 207
Plant Area 148,800
ft2
Annual Production 259,200
units
Production Hrs. Annual 2,375
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $125,507 2,004,800
kWh
Electricity Demand $113,641 8,990
kW-mo/yr
Natural Gas $1,626 287
MMBtu
Waste Disposal Costs
Water Usage $1,619 757,500
Tgal
Water Disposal $8,272 758
Tgal
Solid Waste (non-haz) $30,000 67,000
lb
TOTAL YEARLY COSTS $280,665
RECOMMENDED SAVINGS* $44,360 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,401

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 3.1191: Change procedures / equipment / operating conditions $36,700 $4,000 - - - $36,700
-
lb
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,092 $3,050 $3,092
49,400
kWh
- - - -
03 2.7241: Install outside air damper / economizer on hvac unit $1,404 $6,000 $1,404
22,425
kWh
- - - -
04 2.6218: Turn off equipment when not in use $1,211 $25 $1,211
19,350
kWh
- - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,190 $3,450 $1,095
17,497
kWh
$95
-
kW-mo/yr
- - -
06 2.2437: Recover waste heat from equipment $665 $750 - - $665
-
MMBtu
- -
07 4.812: Apply for investment incentives $98 $20 - - - - $98
TOTAL RECOMMENDED $44,360 $17,295 $6,802
108,672
kWh
$95
-
kW-mo/yr
$665
-
MMBtu
$36,700
-
lb
$98
TOTAL IMPLEMENTED $4,401 $3,095 $4,303
68,750
kWh
- - - $98
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs