ITAC Assessment: GT0630
ITAC logo
ITAC Assessment: GT0630
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Footwear
NAICS
n/a
SIC 3149: Footwear, Except Rubber, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 185
Plant Area 64,225
ft2
Annual Production 612,000
pieces
Production Hrs. Annual 3,920
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,887 2,696,366
kWh
Electricity Demand $126,208 11,309
kW-mo/yr
Electricity Fees $14,357 -
LPG $23,014 2,821
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,063 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,543

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,900 $20,800 $2,847
94,959
kWh
$3,669
-
kW-mo/yr
$384 - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,370 $500 $1,989
66,237
kWh
$2,143
-
kW-mo/yr
$238 - - -
03 2.7122: Disconnect ballasts $153 $280 $50
1,758
kWh
$94
-
kW-mo/yr
$9 - - -
04 2.8112: Combine utility meters $2,920 - - - - - - $2,920
05 2.3212: Optimize plant power factor $6,200 $3,900 - $5,848
-
kW-mo/yr
$352 - - -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $7,540 $6,700 - - - $7,540
-
lb
- -
07 2.6218: Turn off equipment when not in use $2,580 - $1,734
54,807
kWh
$710
-
kW-mo/yr
$136 - - -
08 3.5311: Recover and reuse waste material $800 - - - - $800
-
lb
- -
09 4.513: Re-arrange equipment layout to reduce labor costs $17,600 $26,600 - - - - $17,600 -
TOTAL RECOMMENDED $49,063 $58,780 $6,620
217,761
kWh
$12,464
-
kW-mo/yr
$1,119 $8,340
-
lb
$17,600 $2,920
TOTAL IMPLEMENTED $21,543 $28,280 $6,620
217,761
kWh
$6,616
-
kW-mo/yr
$767 $7,540
-
lb
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs