Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Leather and leather products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0142 #10 Y:2019 Use photocell controls $103 $201
WM0142 #09 Y:2019 Install compressor air intakes in coolest locations $258 $1,370
WM0142 #08 Y:2019 Utilize higher efficiency lamps and/or ballasts $351 $1,115
WM0142 #07 Y:2019 Utilize energy-efficient belts and other improved mechanisms $418 $750
WM0142 #06 Y:2019 Utilize higher efficiency lamps and/or ballasts $619 $1,160
WM0142 #05 Y:2019 Recharge batteries on during off-peak demand periods $1,795 $2,700
WM0142 #04 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $4,469 $3,500
WM0142 #03 Y:2019 Install vinyl strip / high speed / air curtain doors $4,679 $6,540
WM0142 #02 Y:2019 Use radiant heater for spot heating $7,329 $9,450
WM0142 #01 Y:2019 Install occupancy sensors $19,750 $28,500
WI0412 #09 Y:2001 Utilize energy-efficient belts and other improved mechanisms $419 $502
WI0412 #08 Y:2001 Reduce illumination to minimum necessary levels $731 -
WI0412 #07 Y:2001 Install vinyl strip / high speed / air curtain doors $1,047 $1,050
WI0412 #06 Y:2001 Install occupancy sensors $1,656 $9,500
WI0412 #05 Y:2001 Eliminate leaks in inert gas and compressed air lines/ valves $1,774 $90
WI0412 #04 Y:2001 Distill contaminated solvents for reuse $3,383 $10,000
WI0412 #03 Y:2001 Reschedule plant operations or reduce load to avoid peaks $3,780 -
WI0412 #02 Y:2001 Reduce air conditioning load by evaporating water from roof $8,966 $11,000
WI0412 #01 Y:2001 Reduce space conditioning during non-working hours $10,881 $1,200
WI0296 #08 Y:1997 Minimize water usage $1,473 $900