ITAC Assessment: NC0660
ITAC logo
ITAC Assessment: NC0660
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Military boots
NAICS 316210: Footwear Manufacturing
SIC 3143: Men's Footwear, Except Athletic
Sales Range $10
M
to 50
M
# of Employees 234
Plant Area 150,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $130,136 1,712,720
kWh
Electricity Demand $50,172 8,168
kW-mo/yr
LPG $36,536 2,638
MMBtu
Waste Disposal Costs
Water Usage $1 1
Tgal
TOTAL YEARLY COSTS $216,845
RECOMMENDED SAVINGS* $10,630 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,499 $3,730 $1,681
21,639
kWh
$818
-
kW-mo/yr
- -
02 2.4225: Install common header on compressors $4,229 $10,000 $2,811
39,754
kWh
$1,418
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $339 $100 $497
6,400
kWh
$242
-
kW-mo/yr
$(-200.0) $(-200.0)
04 2.8114: Change rate schedules or other changes in utility service $3,563 $500 $3,563
1
kWh
- - -
TOTAL RECOMMENDED $10,630 $14,330 $8,552
67,794
kWh
$2,478
-
kW-mo/yr
$(-200.0) $(-200.0)
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs