ITAC Assessment: CO0688
ITAC logo
ITAC Assessment: CO0688
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 32,000
ft2
Annual Production 65,900
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,404 1,452,096
kWh
Electricity Demand $60,120 4,124
kW-mo/yr
Electricity Fees $1,484 -
Natural Gas $43,989 7,763
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,480 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,390

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $4,830 $8,050 $3,500
79,500
kWh
$1,330
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,390 $1,500 $1,730
39,400
kWh
$660
-
kW-mo/yr
- - -
03 2.2437: Recover waste heat from equipment $2,490 $10,380 - - $2,490
-
MMBtu
- -
04 2.4133: Use most efficient type of electric motors $610 $2,270 $440
9,900
kWh
$170
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,160 $3,140 $780
17,500
kWh
$290
-
kW-mo/yr
- $40 $50
TOTAL RECOMMENDED $11,480 $25,340 $6,450
146,300
kWh
$2,450
-
kW-mo/yr
$2,490
-
MMBtu
$40 $50
TOTAL IMPLEMENTED $2,390 $1,500 $1,730
39,400
kWh
$660
-
kW-mo/yr
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs