Assessment Year | 2014 |
---|---|
Principal Product | Beer |
NAICS | 312120: Breweries |
SIC | 2082: Malt Beverages |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
32,000
ft2
|
Annual Production | 65,900
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $51,404 | 1,452,096 |
kWh
|
$0.035 |
Electricity Demand | $60,120 | 4,124 |
kW-mo/yr
|
$14.58 |
Electricity Fees | $1,484 | - |
|
- |
Natural Gas | $43,989 | 7,763 |
MMBtu
|
$5.67 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,480 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,390 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2621: Modify refrigeration system to operate at a lower pressure | $4,830 | $8,050 |
$3,500
79,500
kWh
|
$1,330
-
kW-mo/yr
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,390 | $1,500 |
$1,730
39,400
kWh
|
$660
-
kW-mo/yr
|
- | - | - | |
03 | 2.2437: Recover waste heat from equipment | $2,490 | $10,380 | - | - |
$2,490
-
MMBtu
|
- | - | |
04 | 2.4133: Use most efficient type of electric motors | $610 | $2,270 |
$440
9,900
kWh
|
$170
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,160 | $3,140 |
$780
17,500
kWh
|
$290
-
kW-mo/yr
|
- | $40 | $50 | |
TOTAL RECOMMENDED | $11,480 | $25,340 |
$6,450
146,300
kWh
|
$2,450
-
kW-mo/yr
|
$2,490
-
MMBtu
|
$40 | $50 | ||
TOTAL IMPLEMENTED | $2,390 | $1,500 |
$1,730
39,400
kWh
|
$660
-
kW-mo/yr
|
- | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs