ITAC Assessment: UD0240
ITAC logo
ITAC Assessment: UD0240
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product TEXTILE HEDDING PRODUCTS
NAICS
n/a
SIC 2392: House furnishing, Except Curtains and Draperies
Sales Range $10
M
to 50
M
# of Employees 372
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,900
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,237 1,821,219
kWh
Natural Gas $35,030 6,960
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,249 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,249

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $6,646 $10,000 $7,315
128,370
kWh
$(-669.0)
-
MMBtu
02 2.4221: Install compressor air intakes in coolest locations $289 $400 $289
10,258
kWh
-
03 2.6232: Install set-back timers $2,314 $300 $2,897
56,858
kWh
$(-583.0)
-
MMBtu
TOTAL RECOMMENDED $9,249 $10,700 $10,501
195,486
kWh
$(-1,252.0)
-
MMBtu
TOTAL IMPLEMENTED $9,249 $10,700 $10,501
195,486
kWh
$(-1,252.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs