ITAC Assessment: UF0261
ITAC logo
ITAC Assessment: UF0261
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Residential Lighting Fixtures
NAICS
n/a
SIC 3645: Residential Electric Lighting Fixtures
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 300,000
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $138,781 1,770,516
kWh
Natural Gas $25,722 3,699
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $902,467 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $771,926

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $10,381 $50 - - $10,381
02 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $128,668 $650,000 $327,974
4,204,572
kWh
$(-190,666.0)
-
MMBtu
$(-8,640.0)
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,621 $1,019 $1,621
20,809
kWh
- -
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,873 $9,381 $1,873
24,326
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $793 $600 $793
3,810
kWh
- -
06 2.2511: Insulate bare equipment $2,774 $690 - $2,774
-
MMBtu
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $226 - $226
2,931
kWh
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $233 $220 $233
3,224
kWh
- -
09 3.5315: Lease / purchase baler; sell cardboard to recycler $702 - - - $702
10 4.111: Add equipment/ operators to reduce production bottleneck $30,000 $413 - - $30,000
11 4.111: Add equipment/ operators to reduce production bottleneck $725,196 $55,800 $(-24,804.0)
(-317,995)
kWh
- $750,000
TOTAL RECOMMENDED $902,467 $718,173 $307,916
3,941,677
kWh
$(-187,892.0)
-
MMBtu
$782,443
TOTAL IMPLEMENTED $771,926 $58,792 $(-21,931.0)
(-287,221)
kWh
$2,774
-
MMBtu
$791,083
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs