Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

349

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Plastics products, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0728 #05 Y:2001 Insulate bare equipment $2,356 $1,555
GT0728 #04 Y:2001 Reschedule plant operations or reduce load to avoid peaks $13,916 -
GT0728 #03 Y:2001 Maintain machines to reduce leaks $2,765 $3,150
GT0728 #02 Y:2001 Utilize higher efficiency lamps and/or ballasts $1,952 $6,346
GT0728 #01 Y:2001 Eliminate leaks in inert gas and compressed air lines/ valves $2,492 $750
WI0413 #06 Y:2001 Install compressor air intakes in coolest locations $928 $640
WI0413 #05 Y:2001 Utilize higher efficiency lamps and/or ballasts $4,732 $25,405
WI0413 #04 Y:2001 Use waste heat from flue gases to heat space conditioning air $6,626 $26,500
WI0413 #03 Y:2001 Improve air circulation with destratification fans / other methods $6,493 $600
WI0413 #02 Y:2001 Utilize energy-efficient belts and other improved mechanisms $8,951 $3,762
WI0413 #01 Y:2001 Install solid waste incinerator for heat $27,075 $130,000
WV0233 #16 Y:2001 Modify workload $28,611 $5,200
WV0233 #15 Y:2001 Reuse / recycle/ sell paper products $4,800 $50
WV0233 #14 Y:2001 Install equipment (eg compactor) to reduce disposal costs $1,875 $740
WV0233 #13 Y:2001 Burn waste oil for heat $7,659 $2,960
WV0233 #12 Y:2001 Utilize higher efficiency lamps and/or ballasts $8,023 $10,350
WV0233 #11 Y:2001 Reduce the pressure of compressed air to the minimum required $934 $50
WV0233 #10 Y:2001 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $19,934 $1,800
WV0233 #09 Y:2001 Install occupancy sensors $3,539 $750
WV0233 #08 Y:2001 Reduce illumination to minimum necessary levels $11,333 $900