| Assessment Year | 2002 |
|---|---|
| Principal Product | Plastic totes and Containers |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 120 |
| Plant Area |
209,381
ft2
|
| Annual Production | 21,000,000
lb
|
| Production Hrs. Annual | 6,600
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $475,395 | 11,282,400 |
kWh
|
$0.042 |
| Electricity Demand | $182,326 | 23,526 |
kW-mo/yr
|
$7.75 |
| Natural Gas | $86,530 | 7,769 |
MMBtu
|
$11.14 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $101,650 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $52,693 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2628: Utilize a less expensive cooling method | $3,670 | $1,375 |
$2,750
65,266
kWh
|
$920
-
kW-mo/yr
|
- | - | - | - | |
| 02 | 2.2437: Recover waste heat from equipment | $2,719 | $624 | - | - |
$2,719
-
MMBtu
|
- | - | - | |
| 03 | 2.7232: Replace existing hvac unit with high efficiency model | $2,145 | $7,000 |
$1,606
38,090
kWh
|
$539
-
kW-mo/yr
|
- | - | - | - | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $988 | $272 |
$741
17,580
kWh
|
$247
-
kW-mo/yr
|
- | - | - | - | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,409 | $3,500 |
$1,805
42,834
kWh
|
$604
-
kW-mo/yr
|
- | - | - | - | |
| 06 | 2.7144: Install spectral reflectors / delamp | $616 | $720 |
$309
7,200
kWh
|
$307
-
kW-mo/yr
|
- | - | - | - | |
| 07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,395 | $1,590 | - | - |
$2,395
-
MMBtu
|
- | - | - | |
| 08 | 2.7111: Reduce illumination to minimum necessary levels | $11,333 | $900 |
$8,497
201,501
kWh
|
$2,836
-
kW-mo/yr
|
- | - | - | - | |
| 09 | 2.7135: Install occupancy sensors | $3,539 | $750 |
$2,655
62,995
kWh
|
$884
-
kW-mo/yr
|
- | - | - | - | |
| 10 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $19,934 | $1,800 |
$14,940
354,530
kWh
|
$4,994
-
kW-mo/yr
|
- | - | - | - | |
| 11 | 2.4231: Reduce the pressure of compressed air to the minimum required | $934 | $50 |
$700
16,616
kWh
|
$234
-
kW-mo/yr
|
- | - | - | - | |
| 12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,023 | $10,350 |
$6,014
142,692
kWh
|
$2,009
-
kW-mo/yr
|
- | - | - | - | |
| 13 | 3.6124: Burn waste oil for heat | $7,659 | $2,960 | - | - |
$7,659
-
MMBtu
|
- | - | - | |
| 14 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $1,875 | $740 | - | - | - |
$1,875
-
gal
|
- | - | |
| 15 | 3.5217: Reuse / recycle/ sell paper products | $4,800 | $50 | - | - | - | - |
$4,800
-
lb
|
- | |
| 16 | 4.426: Modify workload | $28,611 | $5,200 | - | - | - | - | - | $28,611 | |
| TOTAL RECOMMENDED | $101,650 | $37,881 |
$40,017
949,304
kWh
|
$13,574
-
kW-mo/yr
|
$12,773
-
MMBtu
|
$1,875
-
gal
|
$4,800
-
lb
|
$28,611 | ||
| TOTAL IMPLEMENTED | $52,693 | $17,107 |
$33,951
805,385
kWh
|
$11,547
-
kW-mo/yr
|
$2,395
-
MMBtu
|
- |
$4,800
-
lb
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs