Assessment Year | 2002 |
---|---|
Principal Product | Plastic Wrapping Material |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
53,800
ft2
|
Annual Production | 7,274,000
lb
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $136,335 | 3,856,020 |
kWh
|
$0.035 |
Electricity Demand | $88,452 | 8,519 |
kW-mo/yr
|
$10.38 |
Electricity Fees | $18,880 | - |
|
- |
Natural Gas | $222,544 | 38,024 |
MMBtu
|
$5.85 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $54,805 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $928 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.6122: Install solid waste incinerator for heat | $27,075 | $130,000 | - | - | - |
$27,075
-
lb
|
|
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $8,951 | $3,762 |
$6,737
208,880
kWh
|
$2,214
-
kW-mo/yr
|
- | - | |
03 | 2.7243: Improve air circulation with destratification fans / other methods | $6,493 | $600 |
$(-281.0)
(-7,546)
kWh
|
- |
$6,774
-
MMBtu
|
- | |
04 | 2.2426: Use waste heat from flue gases to heat space conditioning air | $6,626 | $26,500 | n/a | - | - |
$6,626
-
MMBtu
|
- |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,732 | $25,405 | n/a |
$2,504
67,320
kWh
|
$2,228
-
kW-mo/yr
|
- | - |
06 | 2.4221: Install compressor air intakes in coolest locations | $928 | $640 |
$706
18,974
kWh
|
$222
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $54,805 | $186,907 |
$9,666
287,628
kWh
|
$4,664
-
kW-mo/yr
|
$13,400
-
MMBtu
|
$27,075
-
lb
|
||
TOTAL IMPLEMENTED | $928 | $640 |
$706
18,974
kWh
|
$222
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs