Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

462

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Plastics products, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0135 #06 Y:2007 Use most efficient type of electric motors $2,093 $11,558
IC0135 #05 Y:2007 Install occupancy sensors $2,488 $2,904
IC0135 #04 Y:2007 Utilize higher efficiency lamps and/or ballasts $607 $1,193
IC0135 #03 Y:2007 Utilize higher efficiency lamps and/or ballasts $489 $228
IC0135 #02 Y:2007 Utilize higher efficiency lamps and/or ballasts $22,848 $48,465
IC0135 #01 Y:2007 Utilize higher efficiency lamps and/or ballasts $8,459 $14,076
BD0332 #07 Y:2007 Chill water to the highest temperature possible $4,182 $2
BD0332 #06 Y:2007 Recover waste heat from equipment $23,837 $40,001
BD0332 #05 Y:2007 Install compressor air intakes in coolest locations $496 $351
BD0332 #04 Y:2007 Reduce the pressure of compressed air to the minimum required $272 $2
BD0332 #03 Y:2007 Utilize higher efficiency lamps and/or ballasts $274 $476
BD0332 #02 Y:2007 Utilize daylight whenever possible in lieu of artificial light $608 $1,401
BD0332 #01 Y:2007 Install occupancy sensors $20,588 $1,951
BD0300 #09 Y:2005 Install equipment to move product $18,720 $17,500
BD0300 #08 Y:2005 Install compressor air intakes in coolest locations $188 $250
BD0300 #07 Y:2005 Install timers on light switches in little used areas $464 $1,000
BD0300 #06 Y:2005 Install occupancy sensors $508 $825
BD0300 #05 Y:2005 Use most efficient type of electric motors $963 $3,450
BD0300 #04 Y:2005 Utilize higher efficiency lamps and/or ballasts $2,237 $5,115
BD0300 #03 Y:2005 Eliminate or reduce compressed air usage $4,234 $4,000