ITAC Assessment: BD0300
ITAC logo
ITAC Assessment: BD0300
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Injection molded plastic parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 60,000
ft2
Annual Production 20,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,137 3,035,802
kWh
Electricity Demand $45,857 7,118
kW-mo/yr
Electricity Fees $11,569 -
Natural Gas $2,569 257
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,058 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,169

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2511: Insulate bare equipment $6,218 $2,772 - - $6,218
-
MMBtu
- -
02 2.2691: Shut off cooling if cold outside air will cool process $5,526 $500 $4,298
137,332
kWh
$1,228
-
kW-mo/yr
- - -
03 2.4239: Eliminate or reduce compressed air usage $4,234 $4,000 $835
26,673
kWh
$3,399
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,237 $5,115 $1,603
51,218
kWh
$634
-
kW-mo/yr
- - -
05 2.4133: Use most efficient type of electric motors $963 $3,450 $468
14,992
kWh
$495
-
kW-mo/yr
- - -
06 2.7135: Install occupancy sensors $508 $825 $370
11,799
kWh
$138
-
kW-mo/yr
- - -
07 2.7132: Install timers on light switches in little used areas $464 $1,000 $379
14,352
kWh
- - $39 $46
08 2.4221: Install compressor air intakes in coolest locations $188 $250 $135
4,300
kWh
$53
-
kW-mo/yr
- - -
09 4.445: Install equipment to move product $18,720 $17,500 - - - $18,720 -
TOTAL RECOMMENDED $39,058 $35,412 $8,088
260,666
kWh
$5,947
-
kW-mo/yr
$6,218
-
MMBtu
$18,759 $46
TOTAL IMPLEMENTED $14,169 $8,637 $6,036
192,850
kWh
$1,915
-
kW-mo/yr
$6,218
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs