ITAC Assessment: OR0411
ITAC logo
ITAC Assessment: OR0411
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Hops pellets
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area
n/a
Annual Production 14,200,000
lb
Production Hrs. Annual 3,400
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $185,166 4,700,017
kWh
Electricity Demand $47,434 15,108
kW-mo/yr
Electricity Fees $12,316 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,183 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,683

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $20,500 $66,000 $20,500
610,100
kWh
- - -
02 2.4133: Use most efficient type of electric motors $8,050 $25,951 $7,519
223,326
kWh
$531
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,510 $4,500 $3,470
33,823
kWh
$1,040
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,377 $6,300 $3,746
95,057
kWh
$1,035
-
kW-mo/yr
$102 $494
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,746 - $1,275
37,861
kWh
$471
-
kW-mo/yr
- -
TOTAL RECOMMENDED $40,183 $102,751 $36,510
1,000,167
kWh
$3,077
-
kW-mo/yr
$102 $494
TOTAL IMPLEMENTED $19,683 $36,751 $16,010
390,067
kWh
$3,077
-
kW-mo/yr
$102 $494
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs