| Assessment Year | 2007 |
|---|---|
| Principal Product | food packaging |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 500 |
| Plant Area |
185,000
ft2
|
| Annual Production | 20,000
pieces
|
| Production Hrs. Annual | 3,984
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $184,317 | 1,886,040 |
kWh
|
$0.098 |
| Electricity Demand | $29,326 | 4,653 |
kW-mo/yr
|
$6.30 |
| Natural Gas | $16,987 | 1,892 |
MMBtu
|
$8.98 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $55,192 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,459 | $14,076 |
$6,413
65,485
kWh
|
$1,296
-
kW-mo/yr
|
$582 | $168 | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $22,848 | $48,465 |
$21,518
219,517
kWh
|
$3,610
-
kW-mo/yr
|
$165 | $(-2,445.0) | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $489 | $228 |
$269
2,743
kWh
|
$63
-
kW-mo/yr
|
$162 | $(-5.0) | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $607 | $1,193 |
$347
3,548
kWh
|
$31
-
kW-mo/yr
|
$75 | $154 | |
| 05 | 2.7135: Install occupancy sensors | $2,488 | $2,904 |
$1,926
28,323
kWh
|
$562
-
kW-mo/yr
|
- | - | |
| 06 | 2.4133: Use most efficient type of electric motors | $2,093 | $11,558 |
$1,753
17,883
kWh
|
$340
-
kW-mo/yr
|
- | - | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,449 | $1,380 |
$3,449
35,203
kWh
|
- | - | - | |
| 08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $945 | - |
$945
9,643
kWh
|
- | - | - | |
| 09 | 2.4323: Use optimum size and capacity equipment | $2,210 | $4,835 |
$2,210
22,542
kWh
|
- | - | - | |
| 10 | 2.8114: Change rate schedules or other changes in utility service | $10,755 | - | - | - | $10,755 | - | |
| 11 | 2.8114: Change rate schedules or other changes in utility service | $849 | - | - | - | $849 | - | |
| TOTAL RECOMMENDED | $55,192 | $84,639 |
$38,830
404,887
kWh
|
$5,902
-
kW-mo/yr
|
$12,588 | $(-2,128.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs