ITAC Assessment: OK0972
ITAC logo
ITAC Assessment: OK0972
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Educated Children
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range less than $500
k
# of Employees 150
Plant Area 220,000
ft2
Annual Production 1,763
units
Production Hrs. Annual 3,800
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $161,774 1,466,164
kWh
Natural Gas $12,305 2,334
MMBtu
Waste Disposal Costs
Water Usage $28,937 2,378
Tgal
TOTAL YEARLY COSTS $203,016
RECOMMENDED SAVINGS* $58,017 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,836

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7241: Install outside air damper / economizer on hvac unit $18,060 $26,250 $18,060
167,492
kWh
02 2.7211: Clean and maintain refrigerant condensers and towers $1,456 $650 $1,456
13,234
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $11,025 $55,774 $11,025
100,229
kWh
04 2.7241: Install outside air damper / economizer on hvac unit $15,938 $27,750 $15,938
144,893
kWh
05 2.7211: Clean and maintain refrigerant condensers and towers $3,380 $1,500 $3,380
30,727
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $8,158 $47,096 $8,158
74,165
kWh
TOTAL RECOMMENDED $58,017 $159,020 $58,017
530,740
kWh
TOTAL IMPLEMENTED $4,836 $2,150 $4,836
43,961
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs