270
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Plastics products, not elsewhere classified | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| BD0492 #11 Y:2016 | 11 | 2016 | Regrind, reuse, or sell scrap plastic parts | $225 | $200 |
n/a
|
| BD0492 #10 Y:2016 | 10 | 2016 | Reschedule plant operations or reduce load to avoid peaks | $285 | $200 |
n/a
|
| BD0492 #09 Y:2016 | 09 | 2016 | Install compressor air intakes in coolest locations | $485 | $1,200 |
n/a
|
| BD0492 #08 Y:2016 | 08 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $529 | $75 |
n/a
|
| BD0492 #07 Y:2016 | 07 | 2016 | Install occupancy sensors | $476 | $600 |
n/a
|
| BD0492 #06 Y:2016 | 06 | 2016 | Reduce the pressure of compressed air to the minimum required | $1,039 | $20 |
n/a
|
| BD0492 #05 Y:2016 | 05 | 2016 | Utilize higher efficiency lamps and/or ballasts | $1,299 | $6,032 |
n/a
|
| BD0492 #04 Y:2016 | 04 | 2016 | Turn off equipment during breaks, reduce operating time | $3,305 | $500 |
n/a
|
| BD0492 #03 Y:2016 | 03 | 2016 | Utilize energy-efficient belts and other improved mechanisms | $8,352 | $2,600 |
n/a
|
| BD0492 #02 Y:2016 | 02 | 2016 | Insulate bare equipment | $10,912 | $4,050 |
n/a
|
| BD0492 #01 Y:2016 | 01 | 2016 | Use most efficient type of electric motors | $17,166 | $21,060 |
n/a
|
| BD0490 #10 Y:2016 | 10 | 2016 | Install compressor air intakes in coolest locations | $394 | $400 | |
| BD0490 #09 Y:2016 | 09 | 2016 | Reduce the pressure of compressed air to the minimum required | $478 | $20 | |
| BD0490 #08 Y:2016 | 08 | 2016 | Install occupancy sensors | $630 | $800 | |
| BD0490 #07 Y:2016 | 07 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $643 | $300 | |
| BD0490 #06 Y:2016 | 06 | 2016 | Use radiant heater for spot heating | $1,813 | $1,100 | |
| BD0490 #05 Y:2016 | 05 | 2016 | Recover waste heat from equipment | $2,072 | $1,500 | |
| BD0490 #04 Y:2016 | 04 | 2016 | Utilize higher efficiency lamps and/or ballasts | $3,902 | $3,069 | |
| BD0490 #03 Y:2016 | 03 | 2016 | Utilize higher efficiency lamps and/or ballasts | $4,025 | $2,501 | |
| BD0490 #02 Y:2016 | 02 | 2016 | Use photocell controls | $7,997 | $2,000 |