Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,988

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Plastics products, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM1004 #04 Y:2026 Reduce the pressure of compressed air to the minimum required $13,554 $125
AM1004 #03 Y:2026 Utilize energy-efficient belts and other improved mechanisms $160 $95
AM1004 #02 Y:2026 Apply for tax-free status for energy purchases $153,709 $15,000
AM1004 #01 Y:2026 Optimize plant power factor $8,060 $19,282
TR0078 #04 Y:2026 Use or replace with energy efficient substitutes $8,985 $44,400
TR0078 #03 Y:2026 Use or replace with energy efficient substitutes $6,640 $12,480
TR0078 #02 Y:2026 Apply for tax-free status for energy purchases $17,418 $2,500
TR0078 #01 Y:2026 Use solar heat to make electricty $87,931 $287,234
SU0600 #11 Y:2026 Convert to indirect temperature control system $6,495 $52,500
SU0600 #10 Y:2026 Install occupancy sensors $498 $1,557
SU0600 #09 Y:2026 Use or replace with energy efficient substitutes $242 $749
SU0600 #08 Y:2026 Conserve energy by efficient use of vending machines $379 $741
SU0600 #07 Y:2026 Install vinyl strip / high speed / air curtain doors $1,742 $2,467
SU0600 #06 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $864 $261
SU0600 #05 Y:2026 Install spectral reflectors / delamp $4,114 $480
SU0600 #04 Y:2026 Reschedule plant operations or reduce load to avoid peaks $4,289 -
SU0600 #03 Y:2026 Reduce the pressure of compressed air to the minimum required $5,515 -
SU0600 #02 Y:2026 Eliminate/reduce an operation $1,015 -
SU0600 #01 Y:2026 Apply for tax-free status for energy purchases $17,922 -
MU0091 #12 Y:2026 Pay bills on time to avoid late fees $6,768 -