Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,859

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Plastics products, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0219 #07 Y:2025 Replace fossil fuel equipment with electrical equipment $51,010 $80,000
IP0219 #06 Y:2025 Install compressor air intakes in coolest locations $2,631 $974
IP0219 #05 Y:2025 Use solar heat to make electricty $92,696 $900,763
IP0219 #04 Y:2025 Recover waste heat from equipment $5,372 $1,319
IP0219 #03 Y:2025 Turn off equipment when not in use $9,717 -
IP0219 #02 Y:2025 Recharge batteries on during off-peak demand periods $9,724 -
IP0219 #01 Y:2025 Moderate cooling tower outlet temperature $73,439 -
UC2520 #06 Y:2025 Increase use of automation $100,000 $403,150
UC2520 #05 Y:2025 Use or replace with energy efficient substitutes $8,693 $58,000
UC2520 #04 Y:2025 Use solar heat to make electricty $202,661 $2,468,607
UC2520 #03 Y:2025 Use or replace with energy efficient substitutes $7,046 $40,000
UC2520 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $3,988 $2,140
UC2520 #01 Y:2025 Install compressor air intakes in coolest locations $14,331 $5,600
TT0349 #12 Y:2025 Install occupancy sensors $1,209 $1,380
TT0349 #11 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $6,862 $23,400
TT0349 #10 Y:2025 Use power during off-peak periods $11,088 -
TT0349 #09 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $19,958 $405
TT0349 #08 Y:2025 Eliminate or reduce compressed air usage $26,144 $122,000
TT0349 #07 Y:2025 Minimize operation of equipment maintained in standby condition $31,487 $9,660
TT0349 #06 Y:2025 Insulate bare equipment $32,092 $6,110