Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Plastics foam products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0063 #08 Y:2014 Use or replace with energy efficient substitutes $57,847 $55,000
WM0063 #07 Y:2014 Insulate bare equipment $1,484 $603
WM0063 #06 Y:2014 Turn off equipment during breaks, reduce operating time $85 -
WM0063 #05 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $22,548 $52,000
WM0063 #04 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $8,305 $5,750
WM0063 #03 Y:2014 Install occupancy sensors $2,876 $2,860
WM0063 #02 Y:2014 Utilize higher efficiency lamps and/or ballasts $1,045 $1,800
WM0063 #01 Y:2014 Utilize higher efficiency lamps and/or ballasts $171 $294
IA0520 #10 Y:2014 Utilize controls to operate equipment only when needed $1,139 $1,000
IA0520 #09 Y:2014 Install compressor air intakes in coolest locations $1,389 $321
IA0520 #08 Y:2014 Utilize higher efficiency lamps and/or ballasts $290 $392
IA0520 #07 Y:2014 Install occupancy sensors $523 $888
IA0520 #06 Y:2014 Install vinyl strip / high speed / air curtain doors $429 $253
IA0520 #05 Y:2014 Reduce the pressure of compressed air to the minimum required $490 $35
IA0520 #04 Y:2014 Utilize higher efficiency lamps and/or ballasts $1,512 $5,026
IA0520 #03 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $3,486 $234
IA0520 #02 Y:2014 Install occupancy sensors $2,673 $3,050
IA0520 #01 Y:2014 Make a practice of turning off lights when not needed $4,603 $2,179
WM0029 #10 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $3,633 $644
WM0029 #09 Y:2013 Reduce fluid flow rates $434 $2,085