Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Plastics foam products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UM0325 #09 Y:2007 Install compressor air intakes in coolest locations $701 $400
UM0325 #08 Y:2007 Reduce illumination to minimum necessary levels $2,151 $1,000
UM0325 #07 Y:2007 Utilize higher efficiency lamps and/or ballasts $2,586 $2,640
UM0325 #06 Y:2007 Install vinyl strip / high speed / air curtain doors $7,729 $1,620
UM0325 #05 Y:2007 Insulate bare equipment $7,856 $4,379
UM0325 #04 Y:2007 Lower temperature during the winter season and vice-versa $9,212 -
UM0325 #03 Y:2007 Recover waste heat from equipment $12,908 $3,000
UM0325 #02 Y:2007 Reduce ventilation air $22,071 $17,000
UM0325 #01 Y:2007 Eliminate or reduce compressed air usage $56,621 $14,400
UM0198 #06 Y:2001 Lease / purchase baler; sell cardboard to recycler $166,400 $175,000
UM0198 #05 Y:2001 Improve air circulation with destratification fans / other methods $8,396 $4,550
UM0198 #04 Y:2001 Install compressor air intakes in coolest locations $1,965 $2,000
UM0198 #03 Y:2001 Eliminate leaks in inert gas and compressed air lines/ valves $1,763 $450
UM0198 #02 Y:2001 Optimize plant power factor $3,042 $3,200
UM0198 #01 Y:2001 Reduce illumination to minimum necessary levels $1,270 $1,200
UM0080 #07 Y:1996 Re-arrange equipment layout to reduce labor costs $910 $300
UM0080 #06 Y:1996 Regrind, reuse, or sell scrap plastic parts $48,048 -
UM0080 #05 Y:1996 Install compressor air intakes in coolest locations $257 $800
UM0080 #04 Y:1996 Install occupancy sensors $2,603 $1,000
UM0080 #03 Y:1996 Change rate schedules or other changes in utility service $11,401 $250