ITAC Assessment: UM0325
ITAC logo
ITAC Assessment: UM0325
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product flexible and rigid foam
NAICS 326150: Urethane and Other Foam Product (except Polystyrene) Manufacturing
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 176
Plant Area 58,000
ft2
Annual Production 5,600,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $304,006 4,276,400
kWh
Electricity Demand $78,884 7,204
kW-mo/yr
Electricity Fees $7,174 -
Natural Gas $99,054 9,946
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $121,835 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $73,562

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $56,621 $14,400 $45,054
633,762
kWh
$11,567
-
kW-mo/yr
-
02 2.7314: Reduce ventilation air $22,071 $17,000 - - $22,071
-
MMBtu
03 2.2437: Recover waste heat from equipment $12,908 $3,000 - - $12,908
-
MMBtu
04 2.7221: Lower temperature during the winter season and vice-versa $9,212 - - - $9,212
-
MMBtu
05 2.2511: Insulate bare equipment $7,856 $4,379 $7,856
86,334
kWh
- -
06 2.7447: Install vinyl strip / high speed / air curtain doors $7,729 $1,620 - - $7,729
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,586 $2,640 $1,829
25,726
kWh
$757
-
kW-mo/yr
-
08 2.7111: Reduce illumination to minimum necessary levels $2,151 $1,000 $1,553
21,840
kWh
$598
-
kW-mo/yr
-
09 2.4221: Install compressor air intakes in coolest locations $701 $400 $558
7,849
kWh
$143
-
kW-mo/yr
-
TOTAL RECOMMENDED $121,835 $44,439 $56,850
775,511
kWh
$13,065
-
kW-mo/yr
$51,920
-
MMBtu
TOTAL IMPLEMENTED $73,562 $16,020 $45,054
633,762
kWh
$11,567
-
kW-mo/yr
$16,941
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs