ITAC Assessment: UM0198
ITAC logo
ITAC Assessment: UM0198
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Foam Gasket and Seals
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 313
Plant Area 150,000
ft2
Annual Production 0
units
Production Hrs. Annual 7,344
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,017 4,355,614
kWh
Electricity Demand $179,177 9,804
kW-mo/yr
Electricity Fees $4,804 -
Natural Gas $23,885 4,934
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $182,836 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7111: Reduce illumination to minimum necessary levels $1,270 $1,200 $586
21,975
kWh
$684
-
kW-mo/yr
- - -
02 2.3212: Optimize plant power factor $3,042 $3,200 - - $3,042 - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,763 $450 $993
27,835
kWh
$770
-
kW-mo/yr
- - -
04 2.4221: Install compressor air intakes in coolest locations $1,965 $2,000 $1,110
31,058
kWh
$855
-
kW-mo/yr
- - -
05 2.7243: Improve air circulation with destratification fans / other methods $8,396 $4,550 - - - $8,396
-
MMBtu
-
06 3.5315: Lease / purchase baler; sell cardboard to recycler $166,400 $175,000 - - - - $166,400
-
lb
TOTAL RECOMMENDED $182,836 $186,400 $2,689
80,868
kWh
$2,309
-
kW-mo/yr
$3,042 $8,396
-
MMBtu
$166,400
-
lb
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs