ITAC Assessment: UM0080
ITAC logo
ITAC Assessment: UM0080
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Automotive Acoustical
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 67,000
ft2
Annual Production 29,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,497 2,091,149
kWh
Electricity Fees $6,568 -
Natural Gas $36,004 8,597
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,297 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $65,512

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Raw Material Savings
01 2.4133: Use most efficient type of electric motors $5,153 $4,400 $5,153
51,876
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,925 $22,088 $7,925
70,340
kWh
- - -
03 2.8114: Change rate schedules or other changes in utility service $11,401 $250 - - $11,401 -
04 2.7135: Install occupancy sensors $2,603 $1,000 $2,603
26,084
kWh
- - -
05 2.4221: Install compressor air intakes in coolest locations $257 $800 $257
2,638
kWh
- - -
06 3.5212: Regrind, reuse, or sell scrap plastic parts $48,048 - - $48,048
-
lb
- -
07 4.513: Re-arrange equipment layout to reduce labor costs $910 $300 - - - $910
TOTAL RECOMMENDED $76,297 $28,838 $15,938
150,938
kWh
$48,048
-
lb
$11,401 $910
TOTAL IMPLEMENTED $65,512 $4,950 $5,153
51,876
kWh
$48,048
-
lb
$11,401 $910
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs