Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

929

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Plastics foam products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UC2409 #10 Y:2024 Use solar heat to make electricty $97,545 $403,849
UC2409 #09 Y:2024 Utilize higher efficiency lamps and/or ballasts $20,316 $22,456
UC2409 #08 Y:2024 Replace boiler $28,994 $154,002
UC2409 #07 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $24,347 $15,260
UC2409 #06 Y:2024 Replace existing hvac unit with high efficiency model $957 $6,632
UC2409 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,298 $1,300
UC2409 #04 Y:2024 Reduce the pressure of compressed air to the minimum required $813 $75
UC2409 #03 Y:2024 Change rate schedules or other changes in utility service $264 -
UC2409 #02 Y:2024 Apply for tax-free status for energy purchases $10,580 -
UC2409 #01 Y:2024 Pay utility bills on time $517 -
UW2410 #07 Y:2024 Change procedures / equipment / operating conditions $1,810 $16,232
UW2410 #06 Y:2024 Use solar heat to make electricty $64,748 $539,875
UW2410 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $9,253 $17,069
UW2410 #04 Y:2024 Use optimum size and capacity equipment $10,200 $60,000
UW2410 #03 Y:2024 Install shelves / racks to utilize unused space $131,806 $610,500
UW2410 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $12,418 $25,000
UW2410 #01 Y:2024 Install equipment to move product $855,879 $575,120
NL0082 #06 Y:2023 Utilize energy-efficient belts and other improved mechanisms $314 $881
NL0082 #05 Y:2023 Utilize higher efficiency lamps and/or ballasts $365 $1,917
NL0082 #04 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $1,690 $2,500