Assessment Year | 2024 |
---|---|
Principal Product | Plastic foam boards |
NAICS | 326130: Laminated Plastics Plate, Sheet (except Packaging), and Shape Manufacturing |
SIC | 3086: Plastics Foam Products |
Sales Range | $10 M to 50M |
# of Employees | 95 |
Plant Area |
75,000
ft2
|
Annual Production | 4,900,000
lb
|
Production Hrs. Annual | 7,512
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $418,214 | 3,840,505 |
kWh
|
$0.11 | |
Electricity Demand | $151,784 | 10,151 |
kW-mo/yr
|
$14.95 | |
Electricity Fees | $19,572 | - |
|
- | |
Fuel Oil #2 | $164,298 | 7,178 |
MMBtu
|
$22.89 | |
Waste Disposal Costs | |||||
Water Usage | $3,396 | 573 |
Tgal
|
$5.93 | |
TOTAL YEARLY COSTS | $757,263 | ||||
RECOMMENDED SAVINGS* | $186,631 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Fuel Oil #2 Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.8123: Pay utility bills on time | $517 | - | - | - | $517 | - | - | |
02 | 2.8121: Apply for tax-free status for energy purchases | $10,580 | - | - | - | $10,580 | - | - | |
03 | 2.8114: Change rate schedules or other changes in utility service | $264 | - | - | - | $264 | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $813 | $75 |
$680
6,241
kWh
|
$133
-
kW-mo/yr
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,298 | $1,300 |
$1,921
17,640
kWh
|
$377
-
kW-mo/yr
|
- | - | - | |
06 | 2.7232: Replace existing hvac unit with high efficiency model | $957 | $6,632 |
$805
7,396
kWh
|
$151
-
kW-mo/yr
|
- | - | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $24,347 | $15,260 |
$21,408
196,586
kWh
|
$2,939
-
kW-mo/yr
|
- | - | - | |
08 | 2.1224: Replace boiler | $28,994 | $154,002 | - | - | - |
$28,994
-
MMBtu
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20,316 | $22,456 |
$18,256
167,640
kWh
|
$2,060
-
kW-mo/yr
|
- | - | - | |
10 | 2.9114: Use solar heat to make electricty | $97,545 | $403,849 |
$110,295
1,012,811
kWh
|
- | - | - | $(-12,750.0) | |
TOTAL RECOMMENDED | $186,631 | $603,574 |
$153,365
1,408,314
kWh
|
$5,660
-
kW-mo/yr
|
$11,361 |
$28,994
-
MMBtu
|
$(-12,750.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Fuel Oil #2 Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs