ITAC Assessment: UC2409
ITAC logo
ITAC Assessment: UC2409
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Plastic foam boards
NAICS 326130: Laminated Plastics Plate, Sheet (except Packaging), and Shape Manufacturing
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 75,000
ft2
Annual Production 4,900,000
lb
Production Hrs. Annual 7,512
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $418,214 3,840,505
kWh
Electricity Demand $151,784 10,151
kW-mo/yr
Electricity Fees $19,572 -
Fuel Oil #2 $164,298 7,178
MMBtu
Waste Disposal Costs
Water Usage $3,396 573
Tgal
TOTAL YEARLY COSTS $757,263
RECOMMENDED SAVINGS* $186,631 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #2 Savings Ancillary Material Cost Savings
01 2.8123: Pay utility bills on time $517 - - - $517 - -
02 2.8121: Apply for tax-free status for energy purchases $10,580 - - - $10,580 - -
03 2.8114: Change rate schedules or other changes in utility service $264 - - - $264 - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $813 $75 $680
6,241
kWh
$133
-
kW-mo/yr
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,298 $1,300 $1,921
17,640
kWh
$377
-
kW-mo/yr
- - -
06 2.7232: Replace existing hvac unit with high efficiency model $957 $6,632 $805
7,396
kWh
$151
-
kW-mo/yr
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $24,347 $15,260 $21,408
196,586
kWh
$2,939
-
kW-mo/yr
- - -
08 2.1224: Replace boiler $28,994 $154,002 - - - $28,994
-
MMBtu
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $20,316 $22,456 $18,256
167,640
kWh
$2,060
-
kW-mo/yr
- - -
10 2.9114: Use solar heat to make electricty $97,545 $403,849 $110,295
1,012,811
kWh
- - - $(-12,750.0)
TOTAL RECOMMENDED $186,631 $603,574 $153,365
1,408,314
kWh
$5,660
-
kW-mo/yr
$11,361 $28,994
-
MMBtu
$(-12,750.0)
TOTAL IMPLEMENTED - - - - - - -