ITAC Assessment: ND0249
ITAC logo
ITAC Assessment: ND0249
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product trucking equipment
NAICS
n/a
SIC 3713: Truck and Bus Bodies
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area 34,000
ft2
Annual Production 140
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $14,525 214,244
kWh
Natural Gas $15,676 3,699
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,381 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,381

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,445 $500 $1,445
17,878
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $300 $150 $300
3,810
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $300 $175 $300
3,810
kWh
-
04 3.5316: Contract a wood pallet recycling company $336 - - $336
-
lb
TOTAL RECOMMENDED $2,381 $825 $2,045
25,498
kWh
$336
-
lb
TOTAL IMPLEMENTED $2,381 $825 $2,045
25,498
kWh
$336
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs