Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Plastics bottles
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0358 #07 Y:2013 Conserve energy by efficient use of vending machines $197 $568
SU0358 #06 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $688 $2,000
SU0358 #05 Y:2013 Eliminate/reduce an operation $3,205 $3,000
SU0358 #04 Y:2013 Utilize higher efficiency lamps and/or ballasts $164 $114
SU0358 #03 Y:2013 Install occupancy sensors $797 $590
SU0358 #02 Y:2013 Install compressor air intakes in coolest locations $13,384 $3,267
SU0358 #01 Y:2013 Eliminate/reduce an operation $347 -
UD0892 #09 Y:2013 Use optimum thickness insulation $2,546 $314
UD0892 #08 Y:2013 Upgrade controls on compressors $4,998 -
UD0892 #07 Y:2013 Recover waste heat from equipment $14,202 $1,200
UD0892 #06 Y:2013 Install motor voltage controller on lightly loaded motors $3,311 $3,800
UD0892 #05 Y:2013 Turn off equipment when not in use $49,827 -
UD0892 #04 Y:2013 Utilize energy-efficient belts and other improved mechanisms $31,028 -
UD0892 #03 Y:2013 Make a practice of turning off lights when not needed $562 -
UD0892 #02 Y:2013 Install occupancy sensors $6,740 $6,852
UD0892 #01 Y:2013 Utilize daylight whenever possible in lieu of artificial light $400 $1,090
SD0470 #08 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $1,241 $2,390
SD0470 #07 Y:2013 Clean or color roof to reduce solar load $3,245 $9,125
SD0470 #06 Y:2013 Reduce the pressure of compressed air to the minimum required $3,569 $600
SD0470 #05 Y:2013 Recharge batteries on during off-peak demand periods $4,160 $14,000