ITAC Assessment: SD0470
ITAC logo
ITAC Assessment: SD0470
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product plastic bottles
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3085: Plastics Bottles
Sales Range $1
M
to 5
M
# of Employees 162
Plant Area 101,340
ft2
Annual Production 123,000,000
pieces
Production Hrs. Annual 6,912
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $524,409 7,462,994
kWh
Electricity Demand $158,869 13,581
kW-mo/yr
Natural Gas $5,822 805
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,522 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,832

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 3.1192: Reduce scrap production $34,364 $57,749 $26,232
373,149
kWh
$7,579
-
kW-mo/yr
$553
-
MMBtu
02 2.6218: Turn off equipment when not in use $10,475 $32,420 $10,475
149,011
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,854 $2,300 $8,075
114,859
kWh
$1,779
-
kW-mo/yr
-
04 2.7134: Use photocell controls $4,614 $4,625 $4,031
57,347
kWh
$583
-
kW-mo/yr
-
05 2.3132: Recharge batteries on during off-peak demand periods $4,160 $14,000 - $4,160
-
kW-mo/yr
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $3,569 $600 $3,569
50,772
kWh
- -
07 2.7425: Clean or color roof to reduce solar load $3,245 $9,125 $3,245
46,153
kWh
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,241 $2,390 $1,241
17,651
kWh
- -
TOTAL RECOMMENDED $71,522 $123,209 $56,868
808,942
kWh
$14,101
-
kW-mo/yr
$553
-
MMBtu
TOTAL IMPLEMENTED $48,832 $64,674 $38,338
545,355
kWh
$9,941
-
kW-mo/yr
$553
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs