| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0529 #06 Y:2016 | 06 | 2016 | Upgrade controls on compressors | $624 | $1,090 | |
| WV0529 #05 Y:2016 | 05 | 2016 | Utilize higher efficiency lamps and/or ballasts | $651 | $1,922 | |
| WV0529 #04 Y:2016 | 04 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $993 | $125 | |
| WV0529 #03 Y:2016 | 03 | 2016 | Reschedule plant operations or reduce load to avoid peaks | $1,056 | $1,000 | |
| WV0529 #02 Y:2016 | 02 | 2016 | Install compressor air intakes in coolest locations | $1,370 | $980 | |
| WV0529 #01 Y:2016 | 01 | 2016 | Insulate bare equipment | $3,852 | $1,833 | |
| IA0540 #09 Y:2015 | 09 | 2015 | Install occupancy sensors | $979 | $4,550 | |
| IA0540 #08 Y:2015 | 08 | 2015 | Reduce the pressure of compressed air to the minimum required | $1,257 | $70 | |
| IA0540 #07 Y:2015 | 07 | 2015 | Install compressor air intakes in coolest locations | $1,669 | $265 | |
| IA0540 #06 Y:2015 | 06 | 2015 | Install vinyl strip / high speed / air curtain doors | $1,863 | $357 | |
| IA0540 #05 Y:2015 | 05 | 2015 | Utilize higher efficiency lamps and/or ballasts | $3,905 | $15,307 | |
| IA0540 #04 Y:2015 | 04 | 2015 | Shut off cooling if cold outside air will cool process | $6,054 | $15,000 | |
| IA0540 #03 Y:2015 | 03 | 2015 | Use most efficient type of electric motors | $6,814 | $7,338 | |
| IA0540 #02 Y:2015 | 02 | 2015 | Utilize higher efficiency lamps and/or ballasts | $14,824 | $22,377 | |
| IA0540 #01 Y:2015 | 01 | 2015 | Use radiant heater for spot heating | $24,230 | $58,000 | |
| OK0921 #05 Y:2015 | 05 | 2015 | Reduce fluid flow rates | $32,332 | $5,000 | |
| OK0921 #04 Y:2015 | 04 | 2015 | Install desiccant humidity control system | $89,313 | $72,000 | |
| OK0921 #03 Y:2015 | 03 | 2015 | Insulate bare equipment | $13,915 | $4,348 | |
| OK0921 #02 Y:2015 | 02 | 2015 | Reschedule plant operations or reduce load to avoid peaks | $12,026 | $832 | |
| OK0921 #01 Y:2015 | 01 | 2015 | Use adjustable frequency drive or multiple speed motors on existing system | $7,838 | $28,060 |