Assessment Year | 2015 |
---|---|
Principal Product | plastic pipes |
NAICS | 326122: Plastics Pipe and Pipe Fitting Manufacturing |
SIC | 3084: Plastics Pipe |
Sales Range | $50 M to 100M |
# of Employees | 50 |
Plant Area |
120,000
ft2
|
Annual Production | 58,000,000
lb
|
Production Hrs. Annual | 8,664
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $571,432 | 15,790,656 |
kWh
|
$0.036 |
Electricity Demand | $367,794 | 23,569 |
kW-mo/yr
|
$15.60 |
Natural Gas | $21,933 | 2,403 |
MMBtu
|
$9.13 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $155,425 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $143,398 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,838 | $28,060 |
$4,397
138,270
kWh
|
$3,441
-
kW-mo/yr
|
|
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $12,026 | $832 | - |
$12,026
-
kW-mo/yr
|
|
03 | 2.2511: Insulate bare equipment | $13,915 | $4,348 |
$8,058
253,381
kWh
|
$5,858
-
kW-mo/yr
|
|
04 | 2.7273: Install desiccant humidity control system | $89,313 | $72,000 |
$44,932
1,412,954
kWh
|
$44,381
-
kW-mo/yr
|
|
05 | 2.5123: Reduce fluid flow rates | $32,332 | $5,000 |
$18,137
570,351
kWh
|
$14,195
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $155,425 | $110,240 |
$75,524
2,374,956
kWh
|
$79,901
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $143,398 | $109,408 |
$75,524
2,374,956
kWh
|
$67,875
-
kW-mo/yr
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs