ITAC Assessment: OK0921
ITAC logo
ITAC Assessment: OK0921
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product plastic pipes
NAICS 326122: Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084: Plastics Pipe
Sales Range $50
M
to 100
M
# of Employees 50
Plant Area 120,000
ft2
Annual Production 58,000,000
lb
Production Hrs. Annual 8,664
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $571,432 15,790,656
kWh
Electricity Demand $367,794 23,569
kW-mo/yr
Natural Gas $21,933 2,403
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $155,425 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $143,398

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,838 $28,060 $4,397
138,270
kWh
$3,441
-
kW-mo/yr
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $12,026 $832 - $12,026
-
kW-mo/yr
03 2.2511: Insulate bare equipment $13,915 $4,348 $8,058
253,381
kWh
$5,858
-
kW-mo/yr
04 2.7273: Install desiccant humidity control system $89,313 $72,000 $44,932
1,412,954
kWh
$44,381
-
kW-mo/yr
05 2.5123: Reduce fluid flow rates $32,332 $5,000 $18,137
570,351
kWh
$14,195
-
kW-mo/yr
TOTAL RECOMMENDED $155,425 $110,240 $75,524
2,374,956
kWh
$79,901
-
kW-mo/yr
TOTAL IMPLEMENTED $143,398 $109,408 $75,524
2,374,956
kWh
$67,875
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs