ITAC Assessment: IA0540
ITAC logo
ITAC Assessment: IA0540
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Plastic Pipe
NAICS 326122: Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084: Plastics Pipe
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 38,500
ft2
Annual Production 22,000,000
lb
Production Hrs. Annual 6,912
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $395,826 6,630,000
kWh
Electricity Demand $207,348 15,696
kW-mo/yr
Electricity Fees $26,277 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,595 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7231: Use radiant heater for spot heating $24,230 $58,000 - - $24,230
02 2.7142: Utilize higher efficiency lamps and/or ballasts $14,824 $22,377 $10,203
170,900
kWh
$4,621
-
kW-mo/yr
-
03 2.4133: Use most efficient type of electric motors $6,814 $7,338 $4,921
82,434
kWh
$1,893
-
kW-mo/yr
-
04 2.2691: Shut off cooling if cold outside air will cool process $6,054 $15,000 $4,629
77,544
kWh
$1,425
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,905 $15,307 $3,905
65,407
kWh
- -
06 2.7447: Install vinyl strip / high speed / air curtain doors $1,863 $357 $1,863
32,221
kWh
- -
07 2.4221: Install compressor air intakes in coolest locations $1,669 $265 $1,203
20,146
kWh
$466
-
kW-mo/yr
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,257 $70 $908
15,206
kWh
$349
-
kW-mo/yr
-
09 2.7135: Install occupancy sensors $979 $4,550 $979
16,395
kWh
- -
TOTAL RECOMMENDED $61,595 $123,264 $28,611
480,253
kWh
$8,754
-
kW-mo/yr
$24,230
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs