Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

711

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Plastics pipe
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AR0096 #01 Y:1996 Reduce illumination to minimum necessary levels $7,955 $1,631
KG0063 #11 Y:1996 Recover and reuse waste material $557,549 $5,000
KG0063 #10 Y:1996 Lease / purchase baler; sell cardboard to recycler $11,613 -
KG0063 #09 Y:1996 Use optimum temperature $3,805 -
KG0063 #08 Y:1996 Isolate hot or cold equipment $5,283 $300
KG0063 #07 Y:1996 Utilize higher efficiency lamps and/or ballasts $5,948 $1,507
KG0063 #06 Y:1996 Eliminate leaks in inert gas and compressed air lines/ valves $1,419 $600
KG0063 #05 Y:1996 Upgrade controls on compressors $143 $400
KG0063 #04 Y:1996 Install timers and/or thermostats $294 $300
KG0063 #03 Y:1996 Utilize energy-efficient belts and other improved mechanisms $5,862 $9,220
KG0063 #02 Y:1996 Reduce ventilation air $3,755 -
KG0063 #01 Y:1996 Use most efficient type of electric motors $1,436 $3,360
AS0159 #09 Y:1995 Utilize higher efficiency lamps and/or ballasts $3,497 $12,300
AS0159 #08 Y:1995 Insulate bare equipment $8,844 $6,860
AS0159 #07 Y:1995 Replace existing chiller with high efficiency model $11,926 $31,350
AS0159 #06 Y:1995 Use cooling tower or economizer to replace chiller cooling $4,366 $20,000
AS0159 #05 Y:1995 Use synthetic lubricant $5,086 $5,202
AS0159 #04 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $13,333 $650
AS0159 #03 Y:1995 Use power during off-peak periods $7,700 $50
AS0159 #02 Y:1995 Utilize energy-efficient belts and other improved mechanisms $5,148 -