Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Fiberglass reinforced epoxy pipe products
NAICS
n/a
SIC 3084: Plastics Pipe
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 46,290
ft2
Annual Production 165,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,942 2,997,362
kWh
Electricity Demand $58,786 9,283
kW-mo/yr
Electricity Fees $1,662 -
Natural Gas $13,322 3,796
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $597,107 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,134

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $1,436 $3,360 $1,077
33,705
kWh
$359
-
kW-mo/yr
- -
02 2.7314: Reduce ventilation air $3,755 - $3,755
117,233
kWh
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,862 $9,220 $4,453
139,215
kWh
$1,409
-
kW-mo/yr
- -
04 2.7261: Install timers and/or thermostats $294 $300 $294
9,086
kWh
- - -
05 2.4224: Upgrade controls on compressors $143 $400 $143
4,396
kWh
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,419 $600 $1,419
44,256
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $5,948 $1,507 $4,424
137,749
kWh
$1,524
-
kW-mo/yr
- -
08 2.2522: Isolate hot or cold equipment $5,283 $300 $5,283
165,006
kWh
- - -
09 2.2211: Use optimum temperature $3,805 - $3,805
317,702
kWh
- - -
10 3.5315: Lease / purchase baler; sell cardboard to recycler $11,613 - - - - $11,613
-
lb
11 3.5311: Recover and reuse waste material $557,549 $5,000 - - $557,549
-
gal
-
TOTAL RECOMMENDED $597,107 $20,687 $24,653
968,348
kWh
$3,292
-
kW-mo/yr
$557,549
-
gal
$11,613
-
lb
TOTAL IMPLEMENTED $32,134 $5,467 $18,638
780,481
kWh
$1,883
-
kW-mo/yr
- $11,613
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs