ITAC Assessment: DL0153
ITAC logo
ITAC Assessment: DL0153
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Waste Water Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 30
Plant Area 250,000
ft2
Annual Production 1,850,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $275,273 4,682,978
kWh
Electricity Demand $41,357 8,030
kW-mo/yr
Electricity Fees $20,136 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,400 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,820

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $6,580 - $6,580
111,500
kWh
-
02 2.5123: Reduce fluid flow rates $13,200 $10,000 $11,790
199,800
kWh
$1,410
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,020 $1,000 $4,020
68,170
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,150 $1,500 $1,050
17,740
kWh
$100
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $190 $500 $140
2,400
kWh
$50
-
kW-mo/yr
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,260 $10,000 $2,260
38,320
kWh
-
TOTAL RECOMMENDED $27,400 $23,000 $25,840
437,930
kWh
$1,560
-
kW-mo/yr
TOTAL IMPLEMENTED $20,820 $23,000 $19,260
326,430
kWh
$1,560
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs