Assessment Year | 2015 |
---|---|
Principal Product | Waste Water Treatment |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | less than $500 k |
# of Employees | 30 |
Plant Area |
250,000
ft2
|
Annual Production | 1,850,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $275,273 | 4,682,978 |
kWh
|
$0.059 |
Electricity Demand | $41,357 | 8,030 |
kW-mo/yr
|
$5.15 |
Electricity Fees | $20,136 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,400 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,820 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,580 | - |
$6,580
111,500
kWh
|
- | |
02 | 2.5123: Reduce fluid flow rates | $13,200 | $10,000 |
$11,790
199,800
kWh
|
$1,410
-
kW-mo/yr
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,020 | $1,000 |
$4,020
68,170
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,150 | $1,500 |
$1,050
17,740
kWh
|
$100
-
kW-mo/yr
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $190 | $500 |
$140
2,400
kWh
|
$50
-
kW-mo/yr
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,260 | $10,000 |
$2,260
38,320
kWh
|
- | |
TOTAL RECOMMENDED | $27,400 | $23,000 |
$25,840
437,930
kWh
|
$1,560
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $20,820 | $23,000 |
$19,260
326,430
kWh
|
$1,560
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs