Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Unsupported plastics film and sheet
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WI0486 #03 Y:2004 Use adjustable frequency drive or multiple speed motors on existing system $3,600 $7,840
WI0486 #02 Y:2004 Install compressor air intakes in coolest locations $5,915 $1,280
WI0486 #01 Y:2004 Modify refrigeration system to operate at a lower pressure $20,351 $18,000
WI0478 #08 Y:2004 Install timers and/or thermostats $2,183 $1,200
WI0478 #07 Y:2004 Meter recycled water (to reduce sewer charges) $4,125 $2,500
WI0478 #06 Y:2004 Utilize higher efficiency lamps and/or ballasts $10,814 $23,430
WI0478 #05 Y:2004 Recover waste heat from equipment $2,285 $1,000
WI0478 #04 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $2,441 -
WI0478 #03 Y:2004 Install compressor air intakes in coolest locations $2,930 $1,040
WI0478 #02 Y:2004 Eliminate or reduce compressed air usage $12,493 $1,500
WI0478 #01 Y:2004 Use adjustable frequency drive or multiple speed motors on existing system $58,920 $59,780
WI0456 #06 Y:2003 Recharge batteries on during off-peak demand periods $1,657 $1,000
WI0456 #05 Y:2003 Utilize energy-efficient belts and other improved mechanisms $2,517 $1,605
WI0456 #04 Y:2003 Utilize outside contracting $5,139 $1,240
WI0456 #03 Y:2003 Upgrade controls on compressors $8,675 $2,014
WI0456 #02 Y:2003 Utilize higher efficiency lamps and/or ballasts $12,687 $27,555
WI0456 #01 Y:2003 Modify refrigeration system to operate at a lower pressure $20,554 $25,000