ITAC Assessment: WI0486
ITAC logo
ITAC Assessment: WI0486
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Extruded Plastic Sheets
NAICS 326112: Plastics Packaging Film and Sheet (including Laminated) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 100,000
ft2
Annual Production 6,000
ton
Production Hrs. Annual 8,400
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $492,999 14,481,600
kWh
Electricity Demand $298,592 30,342
kW-mo/yr
Electricity Fees $43,272 -
Natural Gas $36,618 3,489
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,050 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,919

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $20,351 $18,000 $14,758
411,080
kWh
$5,593
-
kW-mo/yr
- -
02 2.4221: Install compressor air intakes in coolest locations $5,915 $1,280 $3,668
102,169
kWh
$2,247
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,600 $7,840 $3,600
100,287
kWh
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,465 - $2,156
60,053
kWh
$1,549
-
kW-mo/yr
- $(-240.0)
05 2.4239: Eliminate or reduce compressed air usage $3,086 $780 $209
5,821
kWh
$2,877
-
kW-mo/yr
- -
06 2.3132: Recharge batteries on during off-peak demand periods $1,509 $700 - $1,509
-
kW-mo/yr
- -
07 2.7135: Install occupancy sensors $671 $300 $671
18,698
kWh
- - -
08 2.7261: Install timers and/or thermostats $453 $800 - - $453
-
MMBtu
-
TOTAL RECOMMENDED $39,050 $29,700 $25,062
698,108
kWh
$13,775
-
kW-mo/yr
$453
-
MMBtu
$(-240.0)
TOTAL IMPLEMENTED $12,919 $2,860 $6,033
168,043
kWh
$6,673
-
kW-mo/yr
$453
-
MMBtu
$(-240.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs