Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Unsupported plastics film and sheet
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK1017 #05 Y:2019 Reschedule plant operations or reduce load to avoid peaks $6,164 -
OK1017 #04 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $1,214 $3,590
OK1017 #03 Y:2019 Utilize higher efficiency lamps and/or ballasts $22,220 $22,288
OK1017 #02 Y:2019 Install / repair insulation on steam lines $10,627 $231
OK1017 #01 Y:2019 Analyze flue gas for proper air/fuel ratio $7,604 $17,500
OK0777 #06 Y:2009 Install timers and/or thermostats $2,638 $779
OK0777 #05 Y:2009 Install outside air damper / economizer on hvac unit $28,753 $33,300
OK0777 #04 Y:2009 Install compressor air intakes in coolest locations $2,136 $3,129
OK0777 #03 Y:2009 Utilize higher efficiency lamps and/or ballasts $4,889 $19,448
OK0777 #02 Y:2009 Chill water to the highest temperature possible $26,234 -
OK0777 #01 Y:2009 Use cooling tower water instead of refrigeration $164,328 $490,000
OK0745 #11 Y:2007 Clean or color roof to reduce solar load $37,616 $286,361
OK0745 #10 Y:2007 Reduce the pressure of compressed air to the minimum required $609 $3,125
OK0745 #09 Y:2007 Use waste heat from hot flue gases to preheat $1,516 $7,600
OK0745 #08 Y:2007 Optimize plant power factor $1,509 $6,760
OK0745 #07 Y:2007 Utilize higher efficiency lamps and/or ballasts $24,171 $81,808
OK0745 #06 Y:2007 Reschedule plant operations or reduce load to avoid peaks $11,998 $9,010
OK0745 #05 Y:2007 Install compressor air intakes in coolest locations $2,437 $1,574
OK0745 #04 Y:2007 Insulate bare equipment $2,384 $744
OK0745 #03 Y:2007 Insulate bare equipment $13,884 $4,859