ITAC Assessment: OK0777
ITAC logo
ITAC Assessment: OK0777
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Plastic Stretch Films
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 130,000
ft2
Annual Production 82,495,387
lb
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,456,581 21,470,400
kWh
Natural Gas $12,368 989
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $228,978 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $224,089

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2612: Use cooling tower water instead of refrigeration $164,328 $490,000 $164,328
2,434,500
kWh
-
02 2.2625: Chill water to the highest temperature possible $26,234 - $26,234
391,564
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,889 $19,448 $4,889
72,965
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $2,136 $3,129 $2,136
31,886
kWh
-
05 2.7241: Install outside air damper / economizer on hvac unit $28,753 $33,300 $28,753
425,979
kWh
-
06 2.7261: Install timers and/or thermostats $2,638 $779 - $2,638
-
MMBtu
TOTAL RECOMMENDED $228,978 $546,656 $226,340
3,356,894
kWh
$2,638
-
MMBtu
TOTAL IMPLEMENTED $224,089 $527,208 $221,451
3,283,929
kWh
$2,638
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs